Whirlpool WHD3090G Owners Manual - Page 23

Connect remaining wires, Optional External Ground for 3-Wire, Connection, Connect neutral wire,

Page 23 highlights

2. Connect neutral wire 2. Connect neutral wire B D C Place hooked end of neutral wire (white or center) (C) of direct wire cable under center screw of terminal block (B), hook facing right. Squeeze hooked end together. Tighten screw. 3. Connect remaining wires B C D Connect neutral wire (white or center) (C) of power supply cord or cable under center terminal block screw (B). Make sure the end of neutral bonding wire (white) (D) looped in Step 1 remains on the center terminal when the power supply cord neutral wire is attached. Tighten screw. 3. Connect remaining wires Place hooked ends of remaining direct wire cable wires under outer terminal block screws (hooks facing right). Squeeze hooked ends together, tighten screws, tighten strain relief screws, and fold insulator over terminal block. Finally, reinsert tab of terminal block cover into slot at bottom edge of terminal block housing. Secure cover with the 2 hold-down screws. Now, go to "Level Dryer." Optional External Ground for 3-Wire Connection (Power Supply Cord Shown) IMPORTANT: You must verify with a qualified electrician that this grounding method is acceptable before connecting. 1. Prepare to connect neutral wire Place ends of remaining wires under outer terminal block screws. Tighten screws and tighten strain relief. 4. Connect external ground wire GA D B A Remove center terminal block screw (B) and green external ground conductor screw (A). Loop neutral bonding wire (white) (D) to center terminal block. Connect a separate copper ground wire (G) under the green external ground conductor screw (A) to an adequate ground. Fold insulator over terminal block. Finally, reinsert tab of terminal block cover into slot at bottom edge of terminal block housing. Secure cover with the 2 hold-down screws. Now, go to "Level Dryer." 23

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68

23
Place hooked end of neutral wire (white
or center) (C) of direct wire cable under
center screw of terminal block (B), hook
facing right. Squeeze hooked end together. Tighten screw.
3.
Connect remaining wires
Place hooked ends of remaining direct wire cable wires
under outer terminal block screws (hooks facing right).
Squeeze hooked ends together, tighten screws, tighten strain
relief screws, and fold insulator over terminal block. Finally,
reinsert tab of terminal block cover into slot at bottom edge
of terminal block housing. Secure cover with the 2 hold-down
screws. Now, go to “Level Dryer.”
Optional External Ground for 3-Wire
Connection
(Power Supply Cord Shown)
IMPORTANT:
You must verify with a qualified electrician
that this grounding method is acceptable before connecting.
Remove center terminal block screw (B) and green external
ground conductor screw (A). Loop neutral bonding wire (white)
(D) to center terminal block.
Connect neutral wire (white or center) (C) of power supply cord
or cable under center terminal block screw (B). Make sure
the end of neutral bonding wire (white) (D) looped in Step 1
remains on the center terminal when the power supply cord
neutral wire is attached. Tighten screw.
Place ends of remaining wires under outer terminal block
screws. Tighten screws and tighten strain relief.
3.
Connect remaining wires
Connect a separate copper ground wire (G) under the green
external ground conductor screw (A) to an adequate ground.
Fold insulator over terminal block. Finally, reinsert tab of
terminal block cover into slot at bottom edge of terminal block
housing. Secure cover with the 2 hold-down screws. Now, go
to “Level Dryer.”
2.
Connect neutral wire
C
B
D
1.
Prepare to connect neutral wire
B
D
A
2.
Connect neutral wire
C
B
D
4.
Connect external ground wire
G
A