Aastra RFP 32 User Guide DECT Site Survey Kit (EMEA) - Page 55

the next base station, base stations included. Ideally however at least two base stations within

Page 55 highlights

Measurement/Planning U-Base stations At these points the selected limit value should be measured. If uninterrupted telephony is to be guaranteed, the next transmitters must also be visible with -70 dBm at these -70 dBm points shown by the previous transmitter. Next walk around the entire radio hop, determine the corresponding locations of the transmitters, and enter them in your plan. IP-Base stations • As the base stations synchronise among themselves, it is imperative that they are in sight of one another, i.e. a base station must not be positioned further away than a maximum of -70dBm from the next base station, base stations included. Ideally however at least two base stations within a cluster should be in sight so that synchronisation is accelerated and fail-safety is increased 53

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62

53
U-Base stations
At these points the selected limit value should be measured.
If uninterrupted telephony is to be guaranteed, the next transmitters must also be visible with
–70 dBm at these –70 dBm points shown by the previous transmitter. Next walk around the entire
radio hop, determine the corresponding locations of the transmitters, and enter them in your plan.
IP-Base stations
As the base stations synchronise among themselves, it is imperative that they are in sight of one
another, i.e. a base station must not be positioned further away than a maximum of –70dBm from
the next base station, base stations included. Ideally however at least two base stations within a
cluster should be in sight so that synchronisation is accelerated and
fail-safety
is increased
Measurement/Planning