Brother International PR-600 Users Manual - English - Page 194
Installing the embroidery, frame holder
View all Brother International PR-600 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 194 highlights
Sapphire.book Page 176 Friday, August 1, 2003 9:12 AM Appendix ■ Removing the cap frame After embroidering is finished, remove the cap frame, and then remove the cap. Remove the cap frame from the cap frame 1 driver. Press both of the two holders at the base of the cap frame with both thumbs, and then pull off the embroidery frame, as shown in the illustration. Installing the embroidery frame holder After embroidering using the cap embroidery frame is finished, remove the needle plate spacer and cap frame driver, and then re-attach the embroidery frame holder. Remove the needle plate spacer. 1 1 1 Holder As shown in the illustration, turn the embroidering position to the side when removing the cap frame so the brim of the cap does not hit the embroidery machine. 1 Needle plate spacer Loosen the two lower thumb screws. 2 • Be careful that the cap frame does not hit any nearby parts, such as the presser foot. Release the snap lock on the cap frame, and 2 then remove the cap. 1 Thumb screws Remove the two upper thumb screws 3 1 2 1 1 Thumb screws 176