Cisco ASR1000-RP2 Software Guide - Page 70
Examples, show version, show platform, show runnning-configuration, show running-config | include boot - asr rp1
View all Cisco ASR1000-RP2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 70 highlights
ISSU Upgrade for Redundant Platforms Chapter 4 Software Upgrade Process Step 7 Command or Action telnet ip-address port Example: [unix-server-1 ~]$ telnet 172.17.52.157 2003 User Access Verification Username: user Password: ******** Router> Step 8 issu acceptversion Step 9 Example: Router# issu acceptversion issu commitversion Step 10 Example: Router# issu commitversion show version show version active-RP running show version active-RP provisioned show platform show running-configuration Step 11 hw-module slot RP-slot reload Example: Router# hw-module slot R0 reload Purpose Log in to the RP being upgraded, preferably using the RP's console port, to complete the upgrade. (This is the new active RP, that was the standby RP prior to the ISSU process.) Note Ensure the hostname does not end in "-stby" after logging into the RP, as this indicates that the RP being accessed is still the standby RP. There are many ways to log on to a console port. The example shows access to the console port from a UNIX host using telnet. (Optional) Stops the ISSU rollback timer. This step is optional as long as Step 9 is completed before the rollback timer expires. Completes the ISSU upgrade. (Optional) Enter the show version, show platform, or show runnning-configuration commands to confirm that the upgrade completed successfully, as follows: • show version-Confirm that the correct software version is running on your router and that the RP was booted from the correct file. • show running-configuration-Confirm that the booting configuration, in particular the boot system statements, are correct. Tip Use the show running-config | include boot command to display only the boot statements from the show running-configuration output. • show platform- Confirm that both RP0 and RP1 are correctly running as active and standby. Reload the new software on the Standby RP. Examples The following example shows how to perfrom consolidated package upgrade in a dual route processor configuration: Router(config)# ip tftp source-interface gigabitethernet 0 Router# copy tftp bootflash: Cisco ASR 1000 Series Aggregation Services Routers Software Configuration Guide 4-8 OL-16506-10