Cisco C8510MSR-SKIT-DC Getting Started - Page 6
Simultaneously close both retaining latches on the blade thereby engaging
UPC - 746320331683
View all Cisco C8510MSR-SKIT-DC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Installing the MCU MSE 8510 iii Slide out the blade or blanking blade. 2 Open both retaining latches on the front of the MCU MSE 8510. When open, a retaining latch is at a 90° angle perpendicular to the front of the blade. 3 Slide the MCU MSE 8510 into the blade slot (as shown in Figure 2) until it stops. 4 Simultaneously close both retaining latches on the blade (thereby engaging the connectors at the rear of the blade) to secure in the chassis as shown in Figure 3. 5 Using a No.1 Phillips screwdriver, tighten the screws in the retaining latches with a clockwise quarter turn.The power is connected automatically as soon as you close the latches. The LCD panel displays messages as parts are checked and eventually you see "Waiting for application to boot" after which the Cisco logo appears followed by the IP address allocated to the MCU MSE 8510. Figure 2: Inserting a blade into the chassis 6