Cisco IE-3000-4TC Installation Guide - Page 169

Simple Network Management Protocol, SunNet Manager

Page 169 highlights

Index removing the switch from a DIN rail or a rack 2-31 to 2-32, B-35 to B-36 removing the switch from parallel and face-down mounted positions 2-31 to 2-32, B-35 to B-36 RJ-45 connector, console port C-4 S safety warnings 2-2 to 2-4, B-2 to B-4 SC connector C-3 serial number location 3-6 SFP modules bale-clasp latch removal 2-40, B-44 cables C-4 connecting to 2-41 to 2-42, B-45 to B-46 connectors C-3 described 1-5 installation 2-38 to 2-40, B-43 to B-44 Simple Network Management Protocol See SNMP SNMP 1-15 software switch management 1-14 to 1-15 specifications A-1 to A-2 speed, troubleshooting 3-4 straight-through cable pinout four twisted-pair 1000BASE-T ports C-6 two twisted-pair 10/100 ports C-5 straight-through cable pinout four twisted-pair 1000BASE-T ports C-7 SunNet Manager 1-15 supply wires warning 2-51, B-3, B-57 switch, power-on 2-22, B-25 switch models 1-2 system LED 1-9 OL-13017-01 T technical specifications A-1 to A-2 Telnet, and accessing the CLI 1-14 temperature, operating A-3 terminal, connecting to a switch 2-12 to 2-13, B-15 to B-16 terminal-emulation software 2-12, B-15 troubleshooting bad or damaged cable 3-2 connection problems 3-2 diagnosing problems 3-1 Ethernet and fiber cables 3-2 link status 3-3 ping end device 3-3 port and interface settings 3-3 POST 3-1 serial number location 3-6 spanning tree loops 3-4 speed, duplex, and autonegotiation 3-4 switch performance 3-4 understanding POST results 3-1 with LEDs 3-2 troubleshooting spanning tree loops 3-4 V verifying package contents 2-5, B-7 verifying switch operation 2-11 to 2-22, B-14 to B-25 W warnings airflow restriction 2-3 ambient temperature 2-3 DC power 2-2 functional ground lug 2-14, B-17 industrial environment B-4 installation 2-2 to 2-4, B-2 to B-4 jewelry removal 2-2, B-2 Cisco IE 3000 Switch Hardware Installation Guide IN-5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170

Index
IN-5
Cisco IE 3000 Switch Hardware Installation Guide
OL-13017-01
removing the switch from a DIN rail or a rack
2-31 to 2-32,
B-35 to B-36
removing the switch from parallel and face-down mounted
positions
2-31 to 2-32, B-35 to B-36
RJ-45 connector, console port
C-4
S
safety warnings
2-2 to 2-4, B-2 to B-4
SC connector
C-3
serial number location
3-6
SFP modules
bale-clasp latch removal
2-40, B-44
cables
C-4
connecting to
2-41 to 2-42, B-45 to B-46
connectors
C-3
described
1-5
installation
2-38 to 2-40, B-43 to B-44
Simple Network Management Protocol
See SNMP
SNMP
1-15
software switch management
1-14 to 1-15
specifications
A-1 to A-2
speed, troubleshooting
3-4
straight-through cable
pinout
four twisted-pair 1000BASE-T ports
C-6
two twisted-pair 10/100 ports
C-5
straight-through cable pinout
four twisted-pair 1000BASE-T ports
C-7
SunNet Manager
1-15
supply wires warning
2-51, B-3, B-57
switch, power-on
2-22, B-25
switch models
1-2
system LED
1-9
T
technical specifications
A-1 to A-2
Telnet, and accessing the CLI
1-14
temperature, operating
A-3
terminal, connecting to a switch
2-12 to 2-13, B-15 to B-16
terminal-emulation software
2-12, B-15
troubleshooting
bad or damaged cable
3-2
connection problems
3-2
diagnosing problems
3-1
Ethernet and fiber cables
3-2
link status
3-3
ping end device
3-3
port and interface settings
3-3
POST
3-1
serial number location
3-6
spanning tree loops
3-4
speed, duplex, and autonegotiation
3-4
switch performance
3-4
understanding POST results
3-1
with LEDs
3-2
troubleshooting spanning tree loops
3-4
V
verifying package contents
2-5, B-7
verifying switch operation
2-11 to 2-22, B-14 to B-25
W
warnings
airflow restriction
2-3
ambient temperature
2-3
DC power
2-2
functional ground lug
2-14, B-17
industrial environment
B-4
installation
2-2 to 2-4, B-2 to B-4
jewelry removal
2-2, B-2