Cisco WAE-674-K9 Hardware Installation Guide - Page 39

Attaching the Cable-Management Assembly, keyboard, monitor, and mouse

Page 39 highlights

Chapter 3 Installing the Wide Area Application Engine Installing the Wide Area Application Engine Note If you installed the cable-management arm bracket in Step 1, complete the installation of the cable-management assembly. Figure 3-7 Attaching the Cable-Management Assembly 2 3 1 134569 1 Hinge pin 2 Left mounting flange 3 Slide rail Step 7 Attach the power cords and other cables to the rear of the WAE (including keyboard, monitor, and mouse, if required). Attach the power cords to the cable-restraint bracket. Secure the cable-restraint bracket to the slide rail. Use cable clamps to secure the cables across the rear of the WAE. Route the cables along the cable-management arm channel, securing them with cable straps. Note Allow slack in all cables to avoid tension in the cables. OL-15012-02 Cisco Wide Area Application Engine 7341, 7371, and 674 Hardware Installation Guide 3-9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152

3-9
Cisco Wide Area Application Engine 7341, 7371, and 674 Hardware Installation Guide
OL-15012-02
Chapter 3
Installing the Wide Area Application Engine
Installing the Wide Area Application Engine
Note
If you installed the cable-management arm bracket in Step 1, complete the
installation of the cable-management assembly.
Figure 3-7
Attaching the Cable-Management Assembly
134569
3
2
1
1
Hinge pin
3
Slide rail
2
Left mounting flange
Step 7
Attach the power cords and other cables to the rear of the WAE (including
keyboard, monitor, and mouse, if required). Attach the power cords to the
cable-restraint bracket. Secure the cable-restraint bracket to the slide rail.
Use cable clamps to secure the cables across the rear of the WAE. Route the cables
along the cable-management arm channel, securing them with cable straps.
Note
Allow slack in all cables to avoid tension in the cables.