Dell N3200-ON PowerSwitch N3200-ON/E3200-ON Series Installation Guide - Page 25

N3200-ON/E3200-ON Series switch installation, Rack or cabinet hardware installation

Page 25 highlights

4 N3200-ON/E3200-ON Series switch installation To install the N3200-ON/E3200-ON Series switch, complete the installation procedures in the order that is presented in this chapter. Always handle the switch and components with care. Avoid dropping the switch or its field replaceable units (FRUs). NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the N3200-ON/E3200-ON Series switch and components. As with all electrical devices of this type, take all the necessary safety precautions to prevent injury when installing this switch. Topics: • Rack or cabinet hardware installation • Ground cable • Desktop • N3208PX-ON ceiling-mount switch installation • N3208PX-ON wall-mount switch installation • Standard bracket two-post installation • Two-post five-inch-offset switch installation • Two-post flush-mount switch installation • Wall- or ceiling-mount switch installation • One RU ReadyRails installation • Optics installation • Switch start-up • After switch placement • Switch replacement Rack or cabinet hardware installation You may either place the switch unit on a rack shelf or mount the switch directly into a 19" wide, EIA-310- E-compliant rack. For 1U switches: ● By default, the switch ships with a two-post rack mount system. ● You can order the ReadyRails system separately and/or the four-post L-bracket rail system for two-post or four-post rack mounting. The ReadyRails system includes separately packaged rail assemblies. WARNING: This document is a condensed reference. Read the safety instructions in your Safety, Environmental, and Regulatory information booklet before you begin. NOTE: The figures in this document are not intended to represent a specific switch. NOTE: Do not the use the mounted ReadyRails as a shelf or a workplace. Rackmount safety considerations ● Rack loading-Overloading or uneven loading of racks may result in shelf or rack failure, possibly damaging the equipment and causing personal injury. Stabilize racks in a permanent location before loading begins. Mount the components starting at the bottom of the rack, and then work to the top. Do not exceed the load rating of your rack. N3200-ON/E3200-ON Series switch installation 25

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88

N3200-ON/E3200-ON Series switch
installation
To install the N3200-ON/E3200-ON Series switch, complete the installation procedures in the order that is presented in this
chapter.
Always handle the switch and components with care. Avoid dropping the switch or its field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the N3200-ON/E3200-ON Series switch and components. As with all electrical devices of this type, take all
the necessary safety precautions to prevent injury when installing this switch.
Topics:
Rack or cabinet hardware installation
Ground cable
Desktop
N3208PX-ON ceiling-mount switch installation
N3208PX-ON wall-mount switch installation
Standard bracket two-post installation
Two-post five-inch-offset switch installation
Two-post flush-mount switch installation
Wall- or ceiling-mount switch installation
One RU ReadyRails installation
Optics installation
Switch start-up
After switch placement
Switch replacement
Rack or cabinet hardware installation
You may either place the switch unit on a rack shelf or mount the switch directly into a 19" wide, EIA-310- E-compliant rack.
For 1U switches:
By default, the switch ships with a two-post rack mount system.
You can order the ReadyRails system separately and/or the four-post L-bracket rail system for two-post or four-post rack
mounting.
The ReadyRails system includes separately packaged rail assemblies.
WARNING:
This document is a condensed reference. Read the safety instructions in your
Safety, Environmental,
and Regulatory
information booklet before you begin.
NOTE:
The figures in this document are not intended to represent a specific switch.
NOTE:
Do not the use the mounted ReadyRails as a shelf or a workplace.
Rackmount safety considerations
Rack loading—Overloading or uneven loading of racks may result in shelf or rack failure, possibly damaging the equipment
and causing personal injury. Stabilize racks in a permanent location before loading begins. Mount the components starting at
the bottom of the rack, and then work to the top. Do not exceed the load rating of your rack.
4
N3200-ON/E3200-ON Series switch installation
25