Two-post flush-mount switch installation

Page 33 highlights

4. Slide the switch into the two-post rack until the mounting bracket ears line up with the rack. 5. Attach the switch to the two-post rack using two #12-24 screws on each side. To uninstall the switch from the rack, unscrew the four #12-24 rackmount screws and slide the switch from the rack. Two-post flush-mount switch installation This switch installation procedure is for the full-width N3200-ON/E3200-ON Series switches only. NOTE: Do not use this installation procedure for the compact N3208PX-ON switch. NOTE: For the N3224PX-ON, N3248P-ON/E3248P-ON, and N3248PXE-ON/E3248PXE-ON switches, to install an external power supply, see the External Power Supply (EPS) Installation for the Dell PowerSwitch N2200-ON and N3200-ON/ E3200-ON Series Switches at www.dell.com/support. The mounting supplies for this installation ship with the switch. 1. Locate the mounting brackets and screws. 2. Insert the mounting brackets onto the mushroom head on each side of the switch and slide the mounting bracket back to lock it into place. The mounting bracket ears face the I/O-side of the switch. 3. Attach the mounting brackets to the switch using four screws for each bracket. N3200-ON/E3200-ON Series switch installation 33

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88

4.
Slide the switch into the two-post rack until the mounting bracket ears line up with the rack.
5.
Attach the switch to the two-post rack using two #12-24 screws on each side.
To uninstall the switch from the rack, unscrew the four #12-24 rackmount screws and slide the switch from the rack.
Two-post flush-mount switch installation
This switch installation procedure is for the full-width N3200-ON/E3200-ON Series switches only.
NOTE:
Do not use this installation procedure for the compact N3208PX-ON switch.
NOTE:
For the N3224PX-ON, N3248P-ON/E3248P-ON, and N3248PXE-ON/E3248PXE-ON switches, to install an external
power supply, see the
External Power Supply (EPS) Installation for the Dell PowerSwitch N2200-ON and N3200-ON/
E3200-ON Series Switches
at
www.dell.com/support
.
The mounting supplies for this installation ship with the switch.
1.
Locate the mounting brackets and screws.
2.
Insert the mounting brackets onto the mushroom head on each side of the switch and slide the mounting bracket back to
lock it into place.
The mounting bracket ears face the I/O-side of the switch.
3.
Attach the mounting brackets to the switch using four screws for each bracket.
N3200-ON/E3200-ON Series switch installation