Dell PowerEdge 2800 Rack- to-Tower Conversion Guide - Page 32
If applicable, install the optional tower bezel see
![]() |
View all Dell PowerEdge 2800 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 32 highlights
www.dell.com | support.dell.com Y1001bk0.book Page 30 Thursday, July 8, 2004 4:32 PM 2 Insert the two tabs on the metal foot into the slots on the side of the system. 3 Rotate the metal foot down and over the hole in each corner and secure the foot with a hex- head Phillips screw that came with the metal foot kit. See Figure 1-18. Repeat this step for the other three metal feet. Figure 1-18. Installing the Metal Feet metal foot tabs and slots (2) metal feet (4) flat working surface hex-head Phillips screws (4) 4 Orient the system as shown in Figure 1-19. 5 If applicable, install the optional tower bezel (see Figure 1-19): To install the bezel hook the left end of the bezel onto the chassis, then fit the free end of the bezel onto the system. Secure the bezel with the keylock. 30 Tower-to-Rack and Rack-to-Tower Conversion Guide
![](/manual_guide/products/dell-poweredge-2800-rack-totower-conversion-guide-fd2d367/32.png)