Dell PowerEdge M520 Dell 10Gb Ethernet Pass Through II for M1000e Software Use - Page 26

Resolving a Link Protocol Mismatch, Resolving CLI Connectivity Problems, Recovery From Non-

Page 26 highlights

Rev 1.00 Software User's Manual chassisaction -m switch- powercycle where is the switch number [1-6]. 5.3 Resolving a Link Protocol Mismatch Log in to 10GbE PTM CLI and run the "show port link" command. Check the status of the downlink and uplink in the relevant port to identify the mismatch - see Section 3.7.1 for details. 5.4 Resolving CLI Connectivity Problems Reboot the 10GbE PTM through the CMC CLI using the following command: chassisaction -m switch- powercycle where is the switch number [1-6]. 5.5 Recovery From Non-Responsive 10GbE PTM CLI Reboot the 10GbE PTM through the CMC CLI using the following command: chassisaction -m switch- powercycle where is the switch number [1-6]. 5.6 Recovery From a Software Update Failure 1. Reboot the 10GbE PTM through the CMC CLI using the following command: chassisaction -m switch- powercycle where is the switch number [1-6]. 2. Restart the software update process. 26

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26

Software User’s Manual
Rev 1.00
26
chassisaction –m switch-<n> powercycle
where <n> is the switch number [1-6].
5.3
Resolving a Link Protocol Mismatch
Log in to 10GbE PTM CLI and run the “show port link” command. Check the status of the down-
link and uplink in the relevant port to identify the mismatch – see
Section 3.7.1
for details.
5.4
Resolving CLI Connectivity Problems
Reboot the 10GbE PTM through the CMC CLI using the following command:
chassisaction –m switch-<n> powercycle
where <n> is the switch number [1-6].
5.5
Recovery From Non-Responsive 10GbE PTM CLI
Reboot the 10GbE PTM through the CMC CLI using the following command:
chassisaction –m switch-<n> powercycle
where <n> is the switch number [1-6].
5.6
Recovery From a Software Update Failure
1. Reboot the 10GbE PTM through the CMC CLI using the following command:
chassisaction –m switch-<n> powercycle
where <n> is the switch number [1-6].
2. Restart the software update process.