Fisher and Paykel OR36SCG6R1 Installation Guide - Page 19
Pressure regulator installation, Use two wrenches to tighten the connection.
View all Fisher and Paykel OR36SCG6R1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
Pressure regulator installation All heavy duty, commercial type cooking equipment must have a pressure regulator on the incoming service line for safe and efficient operation, since service pressure may fluctuate with local demand. z The regulator supplied with this range must be installed before any gas connections are made. z Use supplied pressure regulator only. IMPORTANT! Use two wrenches to tighten the connection. GAS CONNECTION Lock Regulator cover 90° 1 90° 2 Arrow Arrow 1 Connect the 1/2" (12.7mm) NPT (conical) male connector to the pressure regulator and tighten by using a wrench. Do not over tighten the connector. Over tightening may crack regulator. Gasket Regulator cover 2 Connect the 1/2" (12.7mm) NPT connector and pressure regulator group to the extension pipe ensuring the supplied gasket is positioned between. The regulator cover must be oriented toward the front side of the range. 3 Insert the extension pipe into the supplied support bracket as shown: z Bend in the metal tab 90 degrees to allow the pipe to be fitted into the bracket. z Bend the metal tab back into it's original position to secure. 19