Gateway E-9425R Gateway E-9425R Server User Guide - Page 53
Replacing the power cage
![]() |
View all Gateway E-9425R manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 53 highlights
www.gateway.com 4 Remove the power distribution board cover (1) by pulling it out of the chassis. 5 Disconnect the main power, CPU power, backplane power, I2C power, and midplane power cables. See "System board" on page 4 for the location of the connectors on the system board. 6 Remove the screw (2) holding the power board into the chassis, then press down the tab (3) and move the power distribution board away from the side of the chassis (4) to disengage the locking tabs and lift it out of the chassis (5). 7 Align the new power distribution board with the stand-off and locking tabs on the chassis, then place it on the stand-offs and slide it toward the side of the chassis until the tab clicks into place. 8 Replace the screw you previously removed. 9 Reconnect the power cables. See "System board" on page 4 for the location of the connectors on the system board. 10 Reinstall the power supply modules by following the instructions in "Replacing a power supply module" on page 45. 11 Follow the instructions in "Closing the server case" on page 30. Replacing the power cage To replace the power cage: 1 Follow the instructions in "Preventing static electricity discharge" on page 28. Make sure that you turn off the server, then unplug the power cord(s) and all other cables connected to the server. 2 Follow the instructions in "Opening the server case" on page 29. 3 Remove the power supply modules by following the instructions in "Replacing a power supply module" on page 45. 4 Remove the power distribution board by following the instructions in "Replacing the hot-swap backplanes" on page 48. 47
![](/manual_guide/products/gateway-computers-e9425r-gateway-e9425r-server-user-guide-a06fbd8/53.png)