Gateway E-9722R Gateway E-9722R Server User Guide - Page 29

Installing Components

Page 29 highlights

CHAPTER 4 Installing Components • Preparing to install components • Preventing static electricity discharge • Opening the server case • Closing the server case • Installing and removing drives • Installing memory • Installing and removing PCI expansion cards • Replacing system fans • Replacing or adding a processor • Replacing a power supply module • Replacing the power distribution module • Replacing the hot-swap backplane • Replacing the CMOS battery • Replacing the control panel • Replacing the system board 23

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108

CHAPTER
4
23
Installing Components
Preparing to install components
Preventing static electricity discharge
Opening the server case
Closing the server case
Installing and removing drives
Installing memory
Installing and removing PCI expansion cards
Replacing system fans
Replacing or adding a processor
Replacing a power supply module
Replacing the power distribution module
Replacing the hot-swap backplane
Replacing the CMOS battery
Replacing the control panel
Replacing the system board