GE AEM08LP Owners Manual - Page 10

Window, Requirements, Storm Window, Attach, The Top Mounting, Seal Strip, Prepare The Air

Page 10 highlights

Installation Instructions WINDOW REQUIREMENTS , These instructions are for a standard double-hung window. You will need to modify them for other types of windows. . The air conditioner can be installed without the accordion panels if needed to fit in a narrow window. See the window opening dimensions. . All supporting parts must be secured to firm wood, masonry or metal. . The electrical outlet must be within reach of the power cord. . Follow the dimensions in the table and illustration for your model. Models AEL05 A 12 1/2" min. B 23"-38" AEL06 AEL08 13 1/2" min. 22 1/2"-38 1/8" A B (With accordion panels) [] ATTACH THE TOP MOUNTING RAIL SEAL STRIP (Some models may have the seal strip already attached to the top mounting rail. If applicable, skip this step.) Remove the backing from the top mounting rail seal strip and attach the seal strip to the bottom of the top mounting rail, along the front edge. Topmountingrail FRONT VIEW I Sealstrip Remove backing from seal strip Top mounting rail [_ PREPARE THE AIR CONDITIONER [] STORM WINDOW REQUIREMENTS A storm window frame will not allow the air conditioner to tilt toward the outside, and will keep it from draining properly. To adjust for this, attach a piece of wood to the sill. WOOD PIECES WIDTH: 2" LENGTH: Long enough to fit inside the window frame. THICKNESS: To determine the thickness, place a piece of wood on the sill to make it 1/2" higher than the top of the storm window frame or the vinyl frame. Attach securely with nails or screws provided by the installer. 1/2" higher than vinyl frame _ (on some windows) [] Install the top mounting rail with 4 Type A screws from the outside of the case. Topmounting rail Bottom mounting rail r_ Hold the accordion panel in one hand and gently pull back to free the open end. 1/2" higher than storm window frame Storm window frame - r_ ,, _ Wood Vinyl frame I ! 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

Installation
Instructions
WINDOW
REQUIREMENTS
, These instructions are for a standard double-hung
window. You will need to modify them for other types
of windows.
. The air conditioner can be installed without the
accordion panels if needed to fit in a narrow
window. See the window opening dimensions.
. All supporting parts must be secured
to firm wood, masonry or metal.
. The electrical outlet must be within reach of the
power cord.
. Follow the dimensions in the table and illustration
for your model.
Models
A
B
AEL05
12 1/2"
min.
23"-38"
AEL06
13 1/2"
min.
22 1/2"-38
1/8"
AEL08
A
B
(With accordion
panels)
[]
STORM WINDOW
REQUIREMENTS
A storm window frame will not allow the air
conditioner to tilt toward the outside, and will keep it
from draining properly.
To adjust for this, attach a piece of wood to the sill.
WOOD PIECES
WIDTH:
2"
LENGTH: Long enough to fit inside the window
frame.
THICKNESS: To determine
the
thickness,
place
a
piece
of wood
on the
sill to make
it 1/2"
higher
than
the top
of the
storm
window
frame
or the vinyl
frame.
Attach securely with nails or screws provided by the
installer.
1/2" higher
than storm
window
frame
Storm window
frame
1/2" higher
than vinyl frame
_ (on some windows)
,,
_
Wood
-
r_
Vinyl frame
I!
[]
ATTACH
THE TOP MOUNTING
RAIL
SEAL STRIP
(Some models may have the seal strip already
attached
to the top mounting
rail. If applicable,
skip this step.)
Remove the backing from
the top mounting
rail
seal strip and attach
the seal strip to the bottom
of the top mounting
rail, along the front edge.
Topmountingrail
Remove
backing
from seal
strip
FRONT VIEW
Top mounting
rail
I
Sealstrip
10
[_
PREPARE THE AIR CONDITIONER
[]
Install the top mounting
rail with
4 Type A
screws
from
the outside
of the case.
Topmounting rail
Bottom mounting rail
r_
Hold the accordion
panel in one hand
and
gently
pull back to free the open end.