HP 6100 HP 4x00/6x00/8x00 Enterprise Virtual Array Updating Product Software G - Page 39
Table 5 XCS 6.240 Pre-upgrade task checklist, continued
View all HP 6100 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 39 highlights
Table 5 XCS 6.240 Pre-upgrade task checklist (continued) Task "Preparing an HP Continuous Access EVA environment for upgrading" (page 35) Time required: Varies depending on replication configuration When to perform: As close as possible to the upgrade "Saving storage system configuration information" (page 37) Time required: 10-15 minutes When to perform: As close as possible to the upgrade Task complete Task checklist 39
Table 5 XCS 6.240 Pre-upgrade task checklist
(continued)
Task complete
Task
“Preparing an HP Continuous Access EVA environment for upgrading” (page 35)
Time required:
Varies depending on replication configuration
When to perform:
As close as possible to the upgrade
“Saving storage system configuration information” (page 37)
Time required:
10–15 minutes
When to perform:
As close as possible to the upgrade
Task checklist
39