HP 6100 HP 4x00/6x00/8x00 Enterprise Virtual Array Updating Product Software G - Page 39

Table 5 XCS 6.240 Pre-upgrade task checklist, continued

Page 39 highlights

Table 5 XCS 6.240 Pre-upgrade task checklist (continued) Task "Preparing an HP Continuous Access EVA environment for upgrading" (page 35) Time required: Varies depending on replication configuration When to perform: As close as possible to the upgrade "Saving storage system configuration information" (page 37) Time required: 10-15 minutes When to perform: As close as possible to the upgrade Task complete Task checklist 39

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66

Table 5 XCS 6.240 Pre-upgrade task checklist
(continued)
Task complete
Task
“Preparing an HP Continuous Access EVA environment for upgrading” (page 35)
Time required:
Varies depending on replication configuration
When to perform:
As close as possible to the upgrade
“Saving storage system configuration information” (page 37)
Time required:
10–15 minutes
When to perform:
As close as possible to the upgrade
Task checklist
39