HP Cluster Platform Introduction v2010 HP Cluster Platform Workgroup System To - Page 22
Power Examples, Caution, Important
![]() |
View all HP Cluster Platform Introduction v2010 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 22 highlights
2.3 Power Examples There are several power issues to consider before installing a Workgroup System Tower. HP recommends using the HP BladeSystem Power Sizer tool to determine the potential power draw for a Workgroup System Tower configuration. Go to: http://h71019.www7.hp.com/ActiveAnswers/cache/347628-0-0-0-121.html HP also recommends that you consult with your HP sales representative who should be familiar with the HP BladeSystem Power Sizer tool and also review the various power examples available. Refer to the Workgroup System Tower QuickSpecs for recommendations for wall outlet power cords. For several high-line power examples, see Appendix A. Caution: When connecting directly to wall outlets, customers should determine the maximum amperage of the wall outlet circuit to prevent power overload. Important: HP recommends that you consult a trained professional for all power options, including wall outlet source, as a fully loaded Workgroup System Tower might exceed the maximum power available from a standard wall outlet socket, especially in locations with only low-line power available. 22 Workgroup System Tower Pre-installation Procedures
![](/manual_guide/products/hewlettpackard-cluster-platform-introduction-v2010-hp-cluster-platform-workgroup-tower-hardware-installation-guide-035f34f/22.png)