HP Cluster Platform Introduction v2010 HP Cluster Platform Workgroup System To - Page 41

Page 41 highlights

Index A about this document, 9 administrative network configuring VLAN for, 28 audience, 9 C c3000 software, 29 cluster configurations, 9 Cluster Platform nodes, 15 cluster platform architecture, 15 comments, reader, 10 compute node, 15 configuration Workgroup System, 13 configure VLANs, 28 connections external network, 27 control node, 15 server blade as, 13 conventions typographic, 10 D diagnostics (see postinstallation and diagnostics) document InfiniBand, 10 organization, 9 reader comments, 10 related information, 10 documentation updates and release notes, 11 DVD optical media, 16 E external network connecting to, 27 F feedback, 10 G gigabit Ethernet HP GbE2c Ethernet switch, 16 H hardware installation, 27 high-line power configuration examples, 31 high-speed interconnect, 18 HP Cluster Platform architecture, 15 website, 10 HPC (see High-Performance Computing) I InfiniBand management documents, 10 optional network, 18 switch module, 18 information, related, 10 installation hardware, 27 intended audience, 9 L LANs setup, 27 legal notices and trademarks, 2 local area networks setup, 27 log-in website, 10 N network external, 27 networks, 16 administrative, 16 optional InfiniBand, 16 setting up local, 27 nodes Cluster Platform Express, 15 O OA (see Onboard Administrator) Onboard Administrator using, 19 operating system Microsoft Windows Compute Cluster, 29 Red Hat, 29 Scali, 29 SUSE, 29 optical media DVD, 16 organization of this book, 9 OS (see operating system) P PDU (see power distribution unit) planning pre-installation, 21 postinstallation and diagnostics, 27 power 41

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44

Index
A
about this document, 9
administrative network
configuring VLAN for, 28
audience, 9
C
c3000
software, 29
cluster
configurations, 9
Cluster Platform
nodes, 15
cluster platform
architecture, 15
comments, reader, 10
compute node, 15
configuration
Workgroup System, 13
configure
VLANs, 28
connections
external network, 27
control node, 15
server blade as, 13
conventions
typographic, 10
D
diagnostics (
see
postinstallation and diagnostics)
document
InfiniBand, 10
organization, 9
reader comments, 10
related information, 10
documentation
updates and release notes, 11
DVD
optical media, 16
E
external network
connecting to, 27
F
feedback, 10
G
gigabit Ethernet
HP GbE2c Ethernet switch, 16
H
hardware
installation, 27
high-line power
configuration examples, 31
high-speed interconnect, 18
HP Cluster Platform
architecture, 15
website, 10
HPC (
see
High-Performance Computing)
I
InfiniBand
management documents, 10
optional network, 18
switch module, 18
information, related, 10
installation
hardware, 27
intended audience, 9
L
LANs
setup, 27
legal notices and trademarks, 2
local area networks
setup, 27
log-in
website, 10
N
network
external, 27
networks, 16
administrative, 16
optional InfiniBand, 16
setting up local, 27
nodes
Cluster Platform Express, 15
O
OA (
see
Onboard Administrator)
Onboard Administrator
using, 19
operating system
Microsoft Windows Compute Cluster, 29
Red Hat, 29
Scali, 29
SUSE, 29
optical media
DVD, 16
organization of this book, 9
OS (
see
operating system)
P
PDU (
see
power distribution unit)
planning
pre-installation, 21
postinstallation and diagnostics, 27
power
41