A-4 Example Configuration 4: 5kVA - 7kVA, N+1 Redundant Enclosure with 32A PDU
![]() |
View all HP Cluster Platform Introduction v2010 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 35 highlights
Figure A-4 Example Configuration 4: 5kVA - 7kVA, N+1 Redundant Enclosure with 32A PDU, and C13 Extension Bars 3 3 2 1 2 3 3 3 7 7 7 4 4 4 5 6 The following list describes the callouts in Figure A-4: 1. Workgroup System Tower rear view 2. 1200W power supplies (six) 3. Six C13-C14 power cords 4. Power strip cords connected to the PDU (three) 5. 32A International PDU (252663-B31 IEC 309-32A) 6. PDU power cord to site power 7. C13 extension bar power strips (three) Figure A-5 provides an example of a 3kVA - 5kVA, N+N redundant enclosure with 16A 3-phase PDU, C20-C13 power cords (not supplied by HP). 35
![](/manual_guide/products/hewlettpackard-cluster-platform-introduction-v2010-hp-cluster-platform-workgroup-tower-hardware-installation-guide-035f34f/35.png)
Figure A-4 Example Configuration 4: 5kVA - 7kVA, N+1 Redundant Enclosure with 32A PDU,
and C13 Extension Bars
5
7
7
7
2
2
6
4
4
4
1
3
3
3
3
3
The following list describes the callouts in
Figure A-4
:
1.
Workgroup System Tower rear view
2.
1200W power supplies (six)
3.
Six C13–C14 power cords
4.
Power strip cords connected to the PDU (three)
5.
32A International PDU (252663-B31 IEC 309-32A)
6.
PDU power cord to site power
7.
C13 extension bar power strips (three)
Figure A-5
provides an example of a 3kVA – 5kVA, N+N redundant enclosure with 16A 3-phase
PDU, C20-C13 power cords (not supplied by HP).