A-3 Example Configuration 3: 3kVA, N+1 RedundantEnclosure with a 16A PDU, C20-C13, cords
View all HP Cluster Platform Introduction v2010 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 34 highlights
Figure A-3 Example Configuration 3: 3kVA, N+1 Redundant Enclosure with a 16A PDU, C20-C13 cords (not supplied by HP) 2 3 1 3 2 33 4 5 The following list describes the callouts in Figure A-3: 1. Workgroup System Tower rear view 2. 1200W power supplies (six) 3. Four C20-C13 power cords (not supplied by HP) 4. 16A PDU 5. 16A PDU power cord to site power Figure A-4 provides an example of a 5kVA - 7kVA, N+1 redundant enclosure with 32A PDU, and with C13 extension bars to provide a sufficient number of outlets. 34 Workgroup System Tower High-Line Power Examples
Figure A-3 Example Configuration 3: 3kVA, N+1 RedundantEnclosure with a 16A PDU, C20-C13
cords (not supplied by HP)
4
5
3
3
3
3
1
2
2
The following list describes the callouts in
Figure A-3
:
1.
Workgroup System Tower rear view
2.
1200W power supplies (six)
3.
Four C20-C13 power cords (not supplied by HP)
4.
16A PDU
5.
16A PDU power cord to site power
Figure A-4
provides an example of a 5kVA - 7kVA, N+1 redundant enclosure with 32A PDU,
and with C13 extension bars to provide a sufficient number of outlets.
34
Workgroup System Tower High-Line Power Examples