HP LH4r HP Netserver LPr Rack Cabling Guide - Page 16

Site Preparation

Page 16 highlights

Chapter 2 Connecting and Routing Cables to the HP NetServer LPr Figure 2-1. The HP NetServer LPr Site Preparation You may want to copy and use the site preparation checklist. Site Preparation Checklist Table 2-1. Site Preparation Checklist HP NetServer Customer Responsibilities Logical and physical network design provided Server configuration parameters determined Disk partition and directory structure determined Required incoming power and data cabling in place Working LAN, one working client, one working printer available, (if integrating into an existing network) Software license requirements met Networking peripherals connected 12

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64

Chapter 2
Connecting and Routing Cables to the HP NetServer LPr
12
Figure 2-1. The HP NetServer LPr
Site Preparation
You may want to copy and use the site preparation checklist.
Site Preparation Checklist
Table 2-1. Site Preparation Checklist
HP NetServer Customer Responsibilities
Logical and physical network design provided
Server configuration parameters determined
Disk partition and directory structure determined
Required incoming power and data cabling in place
Working LAN, one working client, one working printer available, (if integrating into an
existing network)
Software license requirements met
Networking peripherals connected