HP LH4r HP Netserver LPr Rack Cabling Guide - Page 7
Verify Shipment and Unpack Server and Storage Unit, WARNING, Prepare Rack Enclosures for Assembly
View all HP LH4r manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
Chapter 1 About This Cabling Reference 3. Verify Shipment and Unpack Server and Storage Unit WARNING The LPr weighs about 40 pounds (18 kg.). Take appropriate lifting precautions when moving it. Get help when removing or replacing an LPr towards the top of a 2 meter rack. Compare the order documents to the packing list or to a list of boxes received. Check to see that all parts are present. Unpack the HP NetServer LPr and external storage and tape backup units (if any were ordered). NOTE Save the boxes and packaging materials if you intend to reship the units and rack. 4. Prepare Rack Enclosures for Assembly WARNING A tip-over hazard exists. Rack enclosures are shipped upright and are top-heavy. Never move enclosures without adequate equipment and assistance. Use caution to prevent the rack from falling over and causing potential damage or injury. Use the anti-tip foot in the rack base. If you receive pre-configured units, follow assembly instructions from your organization first, if you have them. Otherwise, continue with this set of instructions. Move Rack Enclosures and Other Units to Installation Location WARNING Whenever you lift equipment, limit the amount of weight each person picks up. Lift with your legs, not with your back. Use two or more people and the proper equipment to move the rack enclosure, server, mass storage units, and other components. Stage cartons a few feet from your assembly and final power-up location. 3