HP StorageWorks 2/128 HP StorageWorks Core Switch 2/64 and SAN Director 2/128 - Page 39
Attaching the left and right flat upper rack mount brackets
![]() |
View all HP StorageWorks 2/128 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 39 highlights
3 2 1 4 1 Left flat upper rack mount bracket 2 #10-32 x 5/16 inch screws (4) SHR-2511A 3 Detached L-shaped brackets (1 of 2) 4 Right flat upper rack mount bracket Figure 7 Attaching the left and right flat upper rack mount brackets 4. Tighten the screws and torque to 32 inch-pounds. 5. Attach the two L-shaped brackets to the rack rails farthest from the service aisle. See Figure 8. • For rails with square holes: Attach the two L-shaped brackets to the rack rails with two of the #1/4-20 x 1/2 inch Phillips panhead screws and two square washers per bracket. Tighten the screws to a torque of 80 inch-pounds. • For rails with round holes: Attach the two L-shaped brackets to the rack rails using two of the #1/4-20 x 1/2 inch Phillips panhead screws per bracket. Tighten the screws to a torque of 80 inch-pounds. 6. Route any cables or cords through the rack or along any other route that will be difficult to reach after the chassis is installed. Leave enough cable allowance to plug and unplug cables from switch. Core Switch 2/64 and SAN Director 2/128 installation guide 39
![](/manual_guide/products/hewlettpackard-storageworks-2128-hp-storageworks-core-switch-264-san-director-2128-installation-guide-aarvuscte-2005-46fb4cd/39.png)