HP StorageWorks 2/128 HP StorageWorks Core Switch 2/64 and SAN Director 2/128 - Page 40
Attaching L-shaped brackets to rails, Finalizing the rack mount procedure
![]() |
View all HP StorageWorks 2/128 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 40 highlights
1 2 3 SHR-2512A 1 Two L-shaped brackets 2 Aligning top screw in hole #37 3 1/4-20 x 1/2 inch Phillips panhead screws and square washers Figure 8 Attaching L-shaped brackets to rails Finalizing the rack mount procedure This section tells you how to slide the switch into the rack and secure the chassis to the rack rails. Sliding the switch into the rack 1. Before lifting the chassis into the rack, determine an easy access route for cables or cords. Make sure that cables do not get pinned under the weight of the chassis. 2. Position the lift device next to the switch. 3. Position one technician at the front of the chassis, and the second technician at the rear of the chassis. Carefully move the chassis onto the lift device. 40 Installing and configuring the switch
![](/manual_guide/products/hewlettpackard-storageworks-2128-hp-storageworks-core-switch-264-san-director-2128-installation-guide-aarvuscte-2005-46fb4cd/40.png)