HP Z420 HP Z420, Z620, and Z820 Workstation Series User Guide - Page 22

Setting up the workstation, Ensuring proper ventilation

Page 22 highlights

3 Setting up the workstation This chapter describes how to set up your workstation. Topics Ensuring proper ventilation on page 14 Setup procedures on page 16 Adding monitors on page 17 Ensuring proper ventilation Proper ventilation for the system is important for workstation operation. Follow these guidelines: ● Operate the workstation on a sturdy, level surface. ● Provide at least 15.24 cm (6 inches) of clearance at the front and back of the workstation. (Workstation models vary.) Figure 3-1 Proper workstation ventilation ● Ensure that the ambient air temperature falls within the environmental specifications listed in this document. 14 Chapter 3 Setting up the workstation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49

3
Setting up the workstation
This chapter describes how to set up your workstation.
Topics
Ensuring proper ventilation
on page
14
Setup procedures
on page
16
Adding monitors
on page
17
Ensuring proper ventilation
Proper ventilation for the system is important for workstation operation. Follow these guidelines:
Operate the workstation on a sturdy, level surface.
Provide at least 15.24 cm (6 inches) of clearance at the front and back of the workstation.
(Workstation models vary.)
Figure 3-1
Proper workstation ventilation
Ensure that the ambient air temperature falls within the environmental specifications listed in this
document.
14
Chapter 3
Setting up the workstation