Updated October 31, 2007 A Figure 96. Installing the I/O tray Routing the cables For ease of installation, IBM recommends that you route the cables in the following order: 1. Power cord 2. Ethernet 3. Cash drawer and other peripheral devices (mouse, keyboard, printer) Follow these instructions to route the cables: 1. Complete the instructions described in "Installing the cable guide and the cable guide arm assembly" on page 89. 2. Open all of the Velcro strips on the cable guide and the cable guide assembly arm. 3. For each cable, insert the connector end into the system unit first, then route it through the cable guide. You can close the Velcro loop around the cord at this time or later in the cable routing process. Chapter 4. Installing external options 93