IBM 4800-741 Operation Guide - Page 80
Installing, slanted, full-size, drawer, fillers, tape-holder
View all IBM 4800-741 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 80 highlights
Updated October 31, 2007 Installing a slanted I/O tray on the full-size cash drawer 1. Install the two mounting tabs ( A ) into the slanted I/O tray. From the inside of the I/O tray, insert the back of the tab first and push the front part into the opening. A Figure 50. Installing two mounting tabs into the slanted I/O tray 2. Turn the I/O tray over. Push on the front of the tab until it clicks into place. 3. Set the I/O tray on top of the full-size cash drawer, and connect the tabs in front of the cash drawer. 4. Attach the I/O tray to the cash drawer by inserting and tightening the two plastic thumbscrews into the holes at the back corners of the I/O tray. Installing the fillers See "Step 7. Installing the fillers on a slanted I/O tray" on page 40. Installing the tape-holder kit To install the tape-holder kit, follow these instructions: 1. Using a screw driver or a coin, remove the tape-holder latch (see Figure 51 on page 61). 60 SurePOS 700 Series: SurePOS 700-721/741/781, 722/742/782 Planning, Installation, and Operation Guide