IBM FAStT500 User Guide - Page 58

CONTAINS, SEALED LEAD, BATTERY., MUST BE, RECYCLED., Check the battery indicator lights, as shown

Page 58 highlights

6 Install the new battery. a Using both hands, slide the battery about 5 cm (2 in.) into the slot. b Using the pull handles, push the battery into the slot completely. c Tighten the four captive screws. 7 Replace the controller unit bezel, as shown in Figure 7 on page 11. 8 Run the system for at least 24 hours to properly charge the batteries. The battery can take up to 15 minutes to complete its self-test and up to 24 hours to fully charge, especially after a power loss of more than a few minutes. When properly charged, both full-charge indicator lights on the front of the battery are on. 9 Check the battery indicator lights, as shown in Figure 20. Fault-B Full Charge-B Fault-A Full Charge-A Figure 20. Battery CRU indicator lights Note: If either the Full Charge-A or the Full Charge-B indicator light is blinking, the battery is in the process of charging. 10 Reset the battery installation date using the storage-management software. The software continues to issue battery-related errors if the installation date is not reset. CONTAINS SEALED LEAD BATTERY. BATTERY MUST BE RECYCLED. Pb 38 IBM FAStT500 RAID Controller Enclosure Unit User's Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90

38
IBM FAStT500 RAID Controller Enclosure Unit User’s Guide
6
Install the new battery.
a
Using both hands, slide the battery about 5 cm (2 in.) into the slot.
b
Using the pull handles, push the battery into the slot completely.
c
Tighten the four captive screws.
7
Replace the controller unit bezel, as shown in
Figure 7 on page 11
.
8
Run the system for at least 24 hours to properly charge the batteries.
The battery can take up to 15 minutes to complete its self-test and up to 24 hours to
fully charge, especially after a power loss of more than a few minutes. When properly
charged, both full-charge indicator lights on the front of the battery are on.
9
Check the battery indicator lights, as shown in
Figure 20
.
Figure 20.
Battery CRU indicator lights
Note:
If either the Full Charge-A or the Full Charge-B indicator light is blinking, the
battery is in the process of charging.
10
Reset the battery installation date using the storage-management software. The
software continues to issue battery-related errors if the installation date is not reset.
Fault-B
Full Charge-B
Fault-A
Full Charge-A
CONTAINS
SEALED LEAD
BATTERY.
BATTERY
MUST BE
RECYCLED.
Pb