Konica Minolta A00F011 Service Manual - Page 120
Image stabilization control execution request
View all Konica Minolta A00F011 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 120 highlights
magicolor 4650EN magicolor 4650DN Theory of operation Ver. 1.0 Nov. 2007 21. Image stabilization control 21.1.4 Image stabilization control execution request • A request for execution of the complete correction control, simplified correction control, or individual registration control is made at the following timing. Stabilization request timing Stabilization request detection timing Execution processing When a new IU is detected Upon replacement of unit When a other used IU is detected When the transfer belt unit is replaced *1 When the power switch is turned ON When the front/right door is closed Complete correction control Complete correction control When the power switch is turned ON Power the switch is turned ON Depending on each condition By main body status When there is a great change in environmental conditions from those when the last stabilization sequence was executed. When there is a temperature change inside the PH unit Power the switch is turned ON/When the front/right door is closed/At the end of a job/ When the sleep mode is deactivated Complete correction control When the front/right door is closed/At the end of a job/dur- individual registration con- ing a job/When the sleep trol mode is deactivated At the end of a print cycle of given conditions At the end of a job Simplified correction control When a malfunction is reset When the power switch is turned ON Complete correction control User selection When quality menu/calibra- When quality menu/calibra- Complete correction tion/AIDC process is selected tion/AIDC process is selected control *1: Since the main body is not provided with a function that detects a new transfer belt unit, quality menu/calibration/AIDC process must be selected and complete correction control executed whenever the unit has been replaced with a new one. Composition/Operation 85