LG LMCN185HV Installation Instructions - Page 36
Connection of piping - Outdoor
View all LG LMCN185HV manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 36 highlights
Flaring Work and Connection of Piping Connection of piping - Outdoor Align the center of the piping and sufficiently tighten the flare nut by hand. Connecting pipe order 1) A~D-UNIT gas side pipe 2) A~D-UNIT liquid side pipe Finally, tighten the flare nut with torque wrench until the wrench clicks. • When tightening the flare nut with torque wrench ensure the direction for tightening follows the arrow on the wrench. Outside diameter mm inch Ø6.35 1/4 Ø9.52 3/8 Ø12.7 1/2 Torque kgf.m(lbf.ft) 1.8~2.5 (13~18) 3.4~4.2 (24~30) 5.5~6.6 (40~48) (Only Indoor Units 18 kBtu/h class ) Outdoor unit(24/36 kBtu/h class) Liquid side piping Gas side piping A-UNIT B-UNIT C-UNIT D-UNIT Main gas side valve Main liquid side valve Outdoor unit(18 kBtu/h class) A-Unit Gas pipe B-Unit Liquid pipe Torque wrench 36 Multi Air Conditioner