LiftMaster Miracle-One MIRACLE ONE Manual - Page 14
Push or Pull, Click - control board
View all LiftMaster Miracle-One manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
PROCEDURE FOR INSTALLATION Mounting Instructions Step 8: Make sure that the operator is level or it will not function properly. An off-level installation may cause the gate or operator to fail prematurely. Step 9: Lock the operator by turning the key to the vertical position while pushing or pulling on the gate until you hear the key release click into place. The gate should not move after the operator has been locked. Completing this successfully finishes the basic mounting of the operator to the gate. The next steps are to make all electrical connections to the operator and control board. Push or Pull Click! Step 10: The following pages show the correct electrical procedures needed for the operator. After completing all the electrical connections, continue to step 11 to complete the final adjustments on the operator. 13