Netgear GS724TPv2 Hardware Installation Guide - Page 14

Installation

Page 14 highlights

Installation This chapter describes the installation procedures for the switch. Switch installation involves the steps that are described in the following sections: • Step 1: Prepare the site on page 15 • Step 2: Protect Against Electrostatic Discharge on page 16 • Step 3: Unpack the Switch on page 16 • Step 4: Mount or Place the Switch on page 17 • Optional Step 5: Install SFP Transceiver Modules on page 18 • Step 6: Attach Devices on page 19 • Step 7: Check the Installation on page 19 • Step 8: Apply AC Power and Check the LEDs on page 20 • Step 9: Manage the Switch on page 20 3 14

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27

3
Installation
This chapter describes the installation procedures for the switch.
Switch installation involves the steps that are described in the following sections:
Step 1: Prepare the site
on page 15
Step 2: Protect Against Electrostatic Discharge
on page 16
Step 3: Unpack the Switch
on page 16
Step 4: Mount or Place the Switch
on page 17
Optional Step 5: Install SFP Transceiver Modules
on page 18
Step 6: Attach Devices
on page 19
Step 7: Check the Installation
on page 19
Step 8: Apply AC Power and Check the LEDs
on page 20
Step 9: Manage the Switch
on page 20
14