Thermador ME301YP Installation Instructions - Page 10
Prior to installation
View all Thermador ME301YP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
en-us Prior to installation 30" Double oven traditional installation Side view *Junction box location: above, left or right of the unit within reach of the flexible conduit. Control panel overlap: min. 3/8" (10mm) to max. 2" (51mm). 30" Double oven flush mount installation Flush installation requires two side cleats to be attached inside the cabinet frame, recessed from the front. Top view bottom hinged door Prior to installation Prior to installation Carry Priortoinstallation out these steps to prepare your appliance for installation. Lifting the appliance Follow these recommendations to prevent injury and damage to the appliance during lifting. CAUTION Risk of crushing! DO NOT attempt to lift the unit by holding the oven's upper heating element. ¡ Remove the bottom hinge oven door prior to installation to access the necessary lifting points and to significantly reduce the unit weight. For double ovens 10