Site prep checklist, system. Checklist items that require a Yes answer are marked with asterisks *.

Page 11 highlights

Site prep checklist The checklist below helps you comprehensively plan for delivery and installation of the HP SVS200 system. Checklist items that require a "Yes" answer are marked with asterisks (*). Customer summary Customer: Date: Address: Contact: Phone: HP representative: Phone: Safety Yes Is there a fire protection system in the computer room? Is the computer room free of any equipment servicing hazards (for example, electrical or data cables that obstruct access)? Is the existing floor plan documented? Has a new floor plan been developed to include the new system? Does the new floor plan include adequate space for airflow and servicing needs? Does the new floor plan include the clearance required for the floor's load rating? Is the computer room structurally complete (walls, floor, air conditioning system, and so on)? Is the raised floor adequate for the equipment load? Is antistatic flooring or mats installed? Are there cutouts or channels for cable routing? Is there a dedicated analog telephone line for "phone home" configuration? Is a telephone line available for HP representative use? Is an ethernet LAN available so that the system can be connected to your intranet? Can the temperature be maintained between 16 and 32 degrees C? Can temperature changes be held to less than 10 degrees C per hour? Can the humidity level be maintained between 20% and 80%? No Reference Fire safety Equipment servicing hazards Space planning requirements Space planning requirements Floor clearance and cutout dimensions Floor clearance and cutout dimensions General computer room requirements Raised floor requirements Preventing electrostatic discharge Floor clearance and cutout dimensions Data comm requirements Data comm requirements Data comm requirements Temperature specifications Temperature specifications Humidity specifications HP StorageWorks 200 Storage Virtualization System site preparation guide 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57

Site prep checklist
The checklist below helps you comprehensively plan for delivery and installation of the HP SVS200
system. Checklist items that require a “Yes” answer are marked with asterisks (*).
Customer summary
Customer:
Date:
Address:
Contact:
Phone:
HP representative:
Phone:
Safety
Yes
No
Reference
Is there a
re protection system in the
computer room?
Fire safety
Is the computer room free of any
equipment servicing hazards (for
example, electrical or data cables that
obstruct access)?
Equipment servicing hazards
Is the existing
oor plan documented?
Space planning requirements
Has a new
oor plan been developed
to include the new system?
Space planning requirements
Does the new
oor plan include
adequate space for air
ow and
servicing needs?
Floor clearance and cutout dimensions
Does the new
oor plan include the
clearance required for the
oor’s load
rating?
Floor clearance and cutout dimensions
Is the computer room structurally
complete (walls,
oor, air conditioning
system, and so on)?
General computer room requirements
Is the raised
oor adequate for the
equipment load?
Raised
oor requirements
Is antistatic
ooring or mats installed?
Preventing electrostatic discharge
Are there cutouts or channels for cable
routing?
Floor clearance and cutout dimensions
Is there a dedicated analog telephone
line for “phone home” con
guration?
Data comm requirements
Is a telephone line available for HP
representative use?
Data comm requirements
Is an ethernet LAN available so that
the system can be connected to your
intranet?
Data comm requirements
Can the temperature be maintained
between 16 and 32 degrees C?
Temperature speci
cations
Can temperature changes be held to
less than 10 degrees C per hour?
Temperature speci
cations
Can the humidity level be maintained
between 20% and 80%?
Humidity speci
cations
HP StorageWorks 200 Storage Virtualization System site preparation guide
11