Rack clearance notes and floor loading The following notes apply to the preceding rack dimensional figures. Note *1: Clearance (a+b) depends on the floor load rating and clearance "c". Required clearances for various floor load ratings are shown below. Floorload rating (kg/ m2) c=0 Required clearance (a + b) mm Clearance (c) mm c = 200 c = 400 c = 600 c = 1000 500 100 0.00 0.00 0.00 0.00 450 200 100 100 0.00 0.00 400 300 200 200 100 0.00 350 500 400 300 300 200 300 900 700 600 500 400 Provide 100 mm of clearance on both sides of the system when the kick plates are to be attached after the system is installed. When systems of the same type are to be installed adjacent to each other, clearance between the systems may be 100 mm. Additional notes on rack floor loading and clearances: • Decide actual clearances in consultation with the construction specialist responsible for installation. They may vary depending on the size and layout of the system and building conditions. • When multiple systems are arranged in a row, base your clearance values on the requirements of the largest system. • Generally, clearances ("c") should be as large as allowable. HP StorageWorks 200 Storage Virtualization System site preparation guide 27

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57

Rack clearance notes and
oor loading
The following notes apply to the preceding rack dimensional
gures.
Note *1: Clearance (a+b) depends on the
oor load rating and clearance “c”. Required clearances
for various
oor load ratings are shown below.
Required clearance (a + b) mm
Clearance (c) mm
Floorload
rating (kg/
m2)
c=0
c = 200
c = 400
c = 600
c = 1000
500
100
0.00
0.00
0.00
0.00
450
200
100
100
0.00
0.00
400
300
200
200
100
0.00
350
500
400
300
300
200
300
900
700
600
500
400
Provide 100 mm of clearance on both sides of the system when the kick plates are to be attached after
the system is installed. When systems of the same type are to be installed adjacent to each other,
clearance between the systems may be 100 mm.
Additional notes on rack
oor loading and clearances:
Decide actual clearances in consultation with the construction specialist responsible for installation.
They may vary depending on the size and layout of the system and building conditions.
When multiple systems are arranged in a row, base your clearance values on the requirements
of the largest system.
Generally, clearances (“c”) should be as large as allowable.