HP 200 HP StorageWorks 200 Storage Virtualization System site preparation guid - Page 45

Packaging con, gurations, Unpacking process, For software CDs, cables, and other installation hardware

Page 45 highlights

Packaging configurations The HP SVS200 rack ships in one of three standard packaging configurations: • Environmental pack - consists of stretch wrap over corner protectors. No special tools or procedures are required to unpack shipments in this form. This packaging is used for most shipments within the USA that are direct from the factory to the customer. HP uses special carriers with a dedicated fleet of trucks and specially trained personnel. • Full packaging - consists of a pallet, wooden loading ramp, inner packaging, and outer corrugated carton assembly. • Full packaging with wooden crate - consists of full packaging encased in a wooden crate. Unpacking process If you need to unpack the equipment without HP supervision, follow the instructions in this section. 1. Following the steps under Removing packaging materials, unpack the equipment cartons outside of the computer room to avoid debris and possible contamination of the computer room environment. 2. For software CDs, cables, and other installation hardware, leave the sealed cartons or packages intact. HP representatives will unpack them when they assist you to install and configure the system. 3. As you unpack the cartons, match the delivered items to the packing list (invoice) for each carton. Contact your HP sales representative immediately if any items are missing or are not the ones you ordered. 4. Move all equipment to the computer room before the installation date. HP StorageWorks 200 Storage Virtualization System site preparation guide 45

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57

Packaging con
gurations
The HP SVS200 rack ships in one of three standard packaging con
gurations:
Environmental pack — consists of stretch wrap over corner protectors. No special tools or
procedures are required to unpack shipments in this form. This packaging is used for most
shipments within the USA that are direct from the factory to the customer. HP uses special carriers
with a dedicated
eet of trucks and specially trained personnel.
Full packaging — consists of a pallet, wooden loading ramp, inner packaging, and outer
corrugated carton assembly.
Full packaging with wooden crate — consists of full packaging encased in a wooden crate.
Unpacking process
If you need to unpack the equipment without HP supervision, follow the instructions in this section.
1.
Following the steps under
Removing packaging materials
, unpack the equipment cartons outside of
the computer room to avoid debris and possible contamination of the computer room environment.
2.
For software CDs, cables, and other installation hardware, leave the sealed cartons or packages
intact. HP representatives will unpack them when they assist you to install and con
gure the system.
3.
As you unpack the cartons, match the delivered items to the packing list (invoice) for each carton.
Contact your HP sales representative immediately if any items are missing or are not the ones
you ordered.
4.
Move all equipment to the computer room before the installation date.
HP StorageWorks 200 Storage Virtualization System site preparation guide
45