HP 200 HP StorageWorks 200 Storage Virtualization System site preparation guid - Page 13

Site prep time allowances, Placing an order for data comm equipment

Page 13 highlights

Site prep time allowances The following site prep tasks may require several weeks: • Acquiring required power connectors • Arranging for an electrician • Adding or modifying air conditioning systems • Making building alterations • Placing an order for data comm equipment The time between placing an equipment order and actual delivery can vary. Contact your HP representative to determine the best estimated delivery dates. HP StorageWorks 200 Storage Virtualization System site preparation guide 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57

Site prep time allowances
The following site prep tasks may require several weeks:
Acquiring required power connectors
Arranging for an electrician
Adding or modifying air conditioning systems
Making building alterations
Placing an order for data comm equipment
The time between placing an equipment order and actual delivery can vary. Contact your HP
representative to determine the best estimated delivery dates.
HP StorageWorks 200 Storage Virtualization System site preparation guide
13