HP rp5400 Carrier Grade Addendum - rp5400 Series of Servers - Page 17

Installation Tasks, Step 1., does not apply

Page 17 highlights

Installation Installation Tasks Installation Tasks Step 1. Prepare the Site Refer to the rp5400 Series of Servers Site Preparation information for general information on site preparation. Information on AC power requirements listed in the rp5400 Series of Servers Site Preparation information does not apply to this product. NOTE For NEBS compliance, the server must be installed in a NEBS certified rack. Step 2. Receive and Unpack the Server Refer to the rp5400 Series of Servers Unpack and Install Instructions. Step 3. Install the Server in a Standalone enclosure See "Installing the Server in a Rack." Step 4. Install Internal Server Components Refer to the rp5400 Series of Servers Unpack and Install Instructions and Installing Add-On Components documents for installation instructions for internal server components. NOTE Some internal components are too delicate to be installed in the server prior to shipping. These internal components are shipped with the server, but are packed separately. They can be installed after the enclosure has been unpacked and positioned. Some of the internal components that are packed separately are not user-installable. To maintain warranty validation, these items must be installed by a Hewlett-Packard Customer Engineer. If you received Central Processing Units (CPUs), contact your Hewlett-Packard provider to arrange for installation. Chapter 1 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62

Chapter 1
Installation
Installation Tasks
5
Installation Tasks
Step 1.
Prepare the Site
Refer to the rp5400 Series of Servers
Site Preparation
information for general information on site
preparation.
Information on AC power requirements listed in the rp5400 Series of Servers
Site Preparation
information
does not apply
to this product.
NOTE
For NEBS compliance, the server must be installed in a NEBS certified rack.
Step 2.
Receive and Unpack the Server
Refer to the rp5400 Series of Servers
Unpack and Install Instructions
.
Step 3.
Install the Server in a Standalone enclosure
See “Installing the Server in a Rack.”
Step 4.
Install Internal Server Components
Refer to the rp5400 Series of Servers
Unpack and Install Instructions
and
Installing Add-On
Components
documents for installation instructions for internal server components.
NOTE
Some internal components are too delicate to be installed in the server prior to shipping.
These internal components are shipped with the server, but are packed separately. They can
be installed after the enclosure has been unpacked and positioned.
Some of the internal components that are packed separately are not user-installable. To
maintain warranty validation, these items must be installed by a Hewlett-Packard Customer
Engineer. If you received Central Processing Units (CPUs), contact your Hewlett-Packard
provider to arrange for installation.