IBM 43635gu User Guide - Page 59
Connect one end of the power cord into the connector on the back of
UPC - 883436002950
View all IBM 43635gu manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 59 highlights
1. Review the safety information that begins on page v and "Installation guidelines" on page 18. 2. Turn off the server and attached devices; then, disconnect all power cords and external cables. 3. Remove the side cover (see "Removing the side cover" on page 21). 4. Disconnect the power cord from the power supply that is to be removed. 5. Press down on the orange release lever and pull the power supply out of the bay, using the handle. 6. If you are instructed to return the hot-swap power supply, follow all packaging instructions, and use any packaging materials for shipping that are supplied to you. 7. Touch the static-protective package that contains the hot-swap power supply to any unpainted metal surface on the server; then, remove the power supply from the package and place it on a static-protective surface. 8. Place the power supply into the bay guides. 9. Press down on the orange release lever and push the power supply toward the front of the chassis until it locks into place. 10. Connect one end of the power cord into the connector on the back of the power supply and connect the other end of the power cord into a properly grounded electrical outlet. 11. Make sure that both the ac and dc power LEDs on the rear of the power supply are lit, indicating that the power supply is operating correctly. 12. Install the side cover (see "Reinstalling the side cover" on page 49). 13. Connect the external cables and power cords. If you have other devices to install or remove, do so now; otherwise go to "Completing the installation" on page 47. Chapter 2. Installing optional devices 45