IBM 43635gu User Guide - Page 61

Completing the installation, Reinstalling the two-piece bezel

Page 61 highlights

the cable cannot be removed. Fasten the cable ends together with a lock. After you add the security cable, make sure that it does not interfere with other cables that are connected to the server. If you have other devices to install or remove, do so now; otherwise, go to "Completing the installation." Completing the installation To complete the installation, you must reinstall the two-piece bezel, reinstall the side cover, connect all the cables and, for some devices, run the Configuration/Setup Utility program. Follow the instructions in this section. Reinstalling the two-piece bezel To reinstall the two-piece bezel, complete the following steps: 1. Install the upper bezel on the front of the server chassis: a. Insert the two right-side tabs on the upper bezel into the matching holes on the right side of the chassis. b. Rotate the upper bezel to the left side of the chassis and press the bezel clips into the matching indentations on the left side of the chassis until the bezel clips snap into place. Chapter 2. Installing optional devices 47

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88

the cable cannot be removed. Fasten the cable ends together with a lock. After
you add the security cable, make sure that it does not interfere with other
cables that are connected to the server.
If you have other devices to install or remove, do so now; otherwise, go to
“Completing the installation.”
Completing the installation
To complete the installation, you must reinstall the two-piece bezel, reinstall the side
cover, connect all the cables and, for some devices, run the Configuration/Setup
Utility program. Follow the instructions in this section.
Reinstalling the two-piece bezel
To reinstall the two-piece bezel, complete the following steps:
1.
Install the upper bezel on the front of the server chassis:
a.
Insert the two right-side tabs on the upper bezel into the matching holes on
the right side of the chassis.
b.
Rotate the upper bezel to the left side of the chassis and press the bezel
clips into the matching indentations on the left side of the chassis until the
bezel clips snap into place.
Chapter 2. Installing optional devices
47