LG HMC036KDT1 Service Manual - Page 31
Pumping
View all LG HMC036KDT1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 31 highlights
(1) Pumping dow Indoor unit H Liquid side Close 2-Way valve Outdoor unit Gas side 3-Way c valve I I11 Indoor unit . Liquid side Close 2-Way valve Gas side " --Open 3-Way valve Ilriil manifold gauge 0 Low handle AS (CLOSE) (3 ) • Hi- handle (CLOSE) el" \. IL IL 2-way, 3-way Valve • Procedure 1. Confirm that both the gas side and liquid side valves are set to the open position. - Remove the valve stem caps and confirm that the valve stems are in the raised position. - Be sure to use a hexagonal wrench to operate the valve stems. 2. Operate the unit for 10 to 15 minutes. 3. Stop operation and wait for 3 minutes, then connect the manifold gauge to the service port of the gas side valve. - Connect the hose of the gauge with the push pin to the service port. 4. Air purging of the charge hose. - Open the Low-handle valve on the gauge slightly to air purge from the hose. 5. Set the liquid side valve to the closed position. 6. Operate the air conditioner at the cooling cycle and stop it when the gauge indicates lkg/cm'g. 7. Immediately set the gas side valve to the closed position. - Do this quickly so that the gauge ends up indicating 1kg/cm g. 8. Disconnect the charge set, and mount the liquid side and gas side valve caps and the service port nut. - Use torque wrench to tighten the service port nut to a torque of 1.8kg.m.(4.2kg*m/5.5kg*m) - Be sure to check for gas leakage. Service Manual 31