Weider 9250 Uk Manual - Page 17

Locate the Carriage Cable 83

Page 17 highlights

37. Wrap the Low Cable (69) around a 90mm Pulley (15). Attach the Pulley and a pair of Pulley Covers (40) to the middle hole in the Front Upright (42) with an M10 x 120mm Bolt (95), an M10 Washer (9), a Large Spacer (96), and an M10 Nylon Locknut (21). Make sure the large tabs on the Pulley Covers are on the side shown. 37 42 Large Tab 40 95 96 40 15 69 9 21 38. Attach a 90mm Pulley (15) to the top hole in the 38 Swivel Bracket (81) with an M10 x 52mm Bolt (103) and an M10 Nylon Locknut (21). Locate the Carriage Cable (83), which has a ball 81 21 on one end and a eyelet on the other. Wrap the Cable around a 90mm Pulley (15). Attach the 15 Pulley to the bottom hole in the Swivel Bracket 83 (81) with an M10 x 45mm Bolt (100) and an M10 Nylon Locknut (21). 100 39. Wrap the Carriage Cable (83) around a 90mm 39 Pulley (15) and route it through the hole in the Carriage Upright (84). Attach the Pulley and a pair of Pulley Covers (40) to the bracket on the Carriage Upright with an M10 x 52mm Bolt (12) and an M10 Nylon Locknut (21). Make sure the 21 large tabs on the Pulley Covers are on the 40 83 side shown. 15 84 40. Wrap the Carriage Cable (83) up around a 90mm Pulley (15). Attach the Pulley and a pair of Pulley Covers (40) inside the indicated bracket on the Stabiliser (5) with an M10 x 115mm Bolt (102). Push the Bolt only through the first bracket. Make sure the large tabs on the Pulley Covers are on the side shown. Hold a 12.5mm Spacer (82) between the two brackets on the Stabiliser (5). Push the M10 x 115mm Bolt (102) through the Spacer, but not into the next bracket. Large Tab 40 12 40 Large Tab 40 15 102 83 40 82 5 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35

17
37. Wrap the Low Cable (69) around a 90mm Pulley
(15). Attach the Pulley and a pair of Pulley
Covers (40) to the middle hole in the Front
Upright (42) with an M10 x 120mm Bolt (95), an
M10 Washer (9), a Large Spacer (96), and an
M10 Nylon Locknut (21).
Make sure the large
tabs on the Pulley Covers are on the side
shown.
39. Wrap the Carriage Cable (83) around a 90mm
Pulley (15) and route it through the hole in the
Carriage Upright (84). Attach the Pulley and a
pair of Pulley Covers (40) to the bracket on the
Carriage Upright with an M10 x 52mm Bolt (12)
and an M10 Nylon Locknut (21).
Make sure the
large tabs on the Pulley Covers are on the
side shown.
40. Wrap the Carriage Cable (83) up around a 90mm
Pulley (15). Attach the Pulley and a pair of Pulley
Covers (40) inside the indicated bracket on the
Stabiliser (5) with an M10 x 115mm Bolt (102).
Push the Bolt only through the first bracket.
Make sure the large tabs on the Pulley Covers
are on the side shown.
Hold a 12.5mm Spacer (82) between the two
brackets on the Stabiliser (5). Push the M10 x
115mm Bolt (102) through the Spacer,
but not
into the next bracket
.
38. Attach a 90mm Pulley (15) to the top hole in the
Swivel Bracket (81) with an M10 x 52mm Bolt
(103) and an M10 Nylon Locknut (21).
Locate the Carriage Cable (83),
which has a ball
on one end and a eyelet on the other. Wrap the
Cable around a 90mm Pulley (15). Attach the
Pulley to the bottom hole in the Swivel Bracket
(81) with an M10 x 45mm Bolt (100) and an M10
Nylon Locknut (21).
37
38
39
40
Large
Tab
42
21
96
40
15
69
40
95
9
100
21
81
15
83
12
15
83
84
21
40
Large
Tab
40
Large
Tab
40
15
83
82
102
5
40