Weider 9400 Instruction Manual - Page 10

Seat Assembly, Arm Assembly

Page 10 highlights

12. Attach the Top Frame (6) between the Squat Upright (4) and the Swivel Upright (5) with four M10 x 95mm Bolts (92), the two Short Frame Plates (52), and two M10 Nylon Locknuts (87) as shown. Do not tighten the Bolts and Locknuts yet. Attach the four Weight Guides (42) to the Top Frame (6) with two M10 x 165mm Bolts (30) and two M10 Nylon Locknuts (87). 13. Press two 50mm x 75mm Inner Caps (58) into the Top Frame (6) and the Butterfly Top Frame (7). Attach the Butterfly Top Frame (7) to the Top Frame (6) with two M10 x 70mm Bolts (85), two M10 Washers (91), and two M10 Nylon Locknuts (87). Do not tighten the Locknuts yet. Attach the Butterfly Top Frame (7) to the Butterfly Upright (3) with two M10 x 95mm Bolts (92), two M10 Washers (91), and two M10 Nylon Locknuts (87). Tighten all of the M10 Nylon Locknuts (87) used in steps 4-13. ARM ASSEMBLY 14. Open the parts bag labelled "ARM ASSEMBLY." Press three 40mm x 50mm Inner Caps (21) into the Leg Lever (10). Lubricate an M10 x 65mm Bolt (18) with grease. Turn the Leg Lever (10) so that the tab is on the indicated side, and attach the Leg Lever to the Seat Upright (9) with the Bolt and an M10 Nylon Locknut (87). Do not overtighten the Locknut; the Leg Lever must be able to pivot easily. 15. Press a 50mm x 70mm Inner Cap (95) into the Butterfly Frame (47). Attach the tethers on the two "L"-pins w/Tether (60) to the Butterfly Frame with an M4 x 20mm Self-tapping Screw (14). Lubricate an M10 x 80mm Bolt (107) with grease. Attach the Butterfly Frame (47) to the Butterfly Top Frame (7) with the Bolt and an M10 Nylon Locknut (87). Do not overtighten the Locknut; the Butterfly Frame must be able to pivot easily. 12 92 52 5 30 13 7 58 6 87 87 87 42 87 52 30 92 91 6 85 92 4 58 91 87 91 14 87 21 21 10 Tab 87 3 9 Lubricate 18 21 15 7 95 87 60 107-Lubricate 14 60 47 10 53. Wrap the Squat Cable (73) under a 90mm Pulley 53 (78). Attach the Pulley and a pair of Pulley Covers (68) to the second set of holes from the top in the indicated bracket on the Long Base (101) with an M10 x 50mm Bolt (100) and an M10 Nylon Locknut (87). Make sure the small tabs on the Pulley Covers are on the top. 54. Wrap the Squat Cable (73) over a 115mm Pulley 54 (119). Attach the Pulley to the indicated bracket on the Top Frame (6) with an M10 x 45mm Bolt (93) and an M10 Nylon Locknut (87). 78 73 68 Small Tab 68 87 100 101 6 87 93 119 73 55. Lift the Weight Tube (43) and the Top Weight (45) and make sure that the small pin on the Weight Tube is inside of the groove under the Top Weight. Place a 50mm Washer (1) on top of the Weight Tube (43) closest to the Squat Upright (4). Thread a M12 Nut (118) halfway onto the end of the Squat Cable (73). Hold the Weight Tube (43) and the Top Weight (45) a few inches over the weight stack and insert the Weight Pin (50). Screw the end of the Squat Cable (73) two full turns into the Weight Tube. Then, tighten the M12 Nut (118) against the 50mm Washer (1). Remove the Weight Pin and set the Top Weight back on the weight stack. Replace the Pin. SEAT ASSEMBLY 56. Locate and open the parts bag labelled "SEAT ASSEMBLY." Insert the Pad Tube (23) into the square hole in the Seat Upright (9). Wet the Pad Tube with soapy water. Slide the two Knee Pads (19) onto the Pad Tube as shown. Press the two Knee Pad Caps (109) into the ends of the Pad Tube. Slide two Short Pads (20) onto the Leg Lever (10). 55 56 109 19 4 73 118 1 45 43 50 19 23 9 19 20 10 109 20

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18

19
10
53. Wrap the Squat Cable (73) under a 90mm Pulley
(78). Attach the Pulley and a pair of Pulley Covers
(68) to the second set of holes from the top in the
indicated bracket on the Long Base (101) with an
M10 x 50mm Bolt (100) and an M10 Nylon Locknut
(87).
Make sure the small tabs on the Pulley
Covers are on the top.
54. Wrap the Squat Cable (73) over a 115mm Pulley
(119). Attach the Pulley to the indicated bracket on
the Top Frame (6) with an M10 x 45mm Bolt (93)
and an M10 Nylon Locknut (87).
55. Lift the Weight Tube (43) and the Top Weight (45)
and make sure that the small pin on the Weight
Tube is inside of the groove under the Top Weight.
Place a 50mm Washer (1) on top of the Weight Tube
(43) closest to the Squat Upright (4). Thread a M12
Nut (118) halfway onto the end of the Squat Cable
(73).
Hold the Weight Tube (43) and the Top Weight (45)
a few inches over the weight stack and insert the
Weight Pin (50). Screw the end of the Squat Cable
(73) two full turns into the Weight Tube. Then, tighten
the M12 Nut (118) against the 50mm Washer (1).
Remove the Weight Pin and set the Top Weight
back on the weight stack. Replace the Pin.
56.
Locate and open the parts bag labelled “SEAT
ASSEMBLY.”
Insert the Pad Tube (23) into the square hole in the
Seat Upright (9). Wet the Pad Tube with soapy
water. Slide the two Knee Pads (19) onto the Pad
Tube as shown. Press the two Knee Pad Caps
(109) into the ends of the Pad Tube.
Slide two Short Pads (20) onto the Leg Lever (10).
56
53
54
55
119
73
10
20
20
23
19
19
9
109
109
87
78
68
68
100
101
SEAT ASSEMBLY
14.
Open the parts bag labelled “ARM ASSEMBLY.”
Press three 40mm x 50mm Inner Caps (21) into the
Leg Lever (10).
Lubricate an M10 x 65mm Bolt (18) with grease.
Turn the Leg Lever (10) so that the tab is on the
indicated side, and attach the Leg Lever to the Seat
Upright (9) with the Bolt and an M10 Nylon Locknut
(87).
Do not overtighten the Locknut; the Leg
Lever must be able to pivot easily.
15. Press a 50mm x 70mm Inner Cap (95) into the
Butterfly Frame (47). Attach the tethers on the two
“L”-pins w/Tether (60) to the Butterfly Frame with an
M4 x 20mm Self-tapping Screw (14).
Lubricate an M10 x 80mm Bolt (107) with grease.
Attach the Butterfly Frame (47) to the Butterfly Top
Frame (7) with the Bolt and an M10 Nylon Locknut
(87).
Do not overtighten the Locknut; the
Butterfly Frame must be able to pivot easily.
ARM ASSEMBLY
13. Press two 50mm x 75mm Inner Caps (58) into the
Top Frame (6) and the Butterfly Top Frame (7).
Attach the Butterfly Top Frame (7) to the Top Frame
(6) with two M10 x 70mm Bolts (85), two M10
Washers (91), and two M10 Nylon Locknuts (87).
Do not tighten the Locknuts yet.
Attach the Butterfly Top Frame (7) to the Butterfly
Upright (3) with two M10 x 95mm Bolts (92), two
M10 Washers (91), and two M10 Nylon Locknuts
(87).
Tighten all of the M10 Nylon Locknuts (87) used
in steps 4–13.
12
13
14
21
21
21
10
87
18
Lubricate
9
Tab
73
6
87
93
43
4
73
118
1
15
45
50
95
87
107—Lubricate
47
60
14
7
60
6
87
87
4
5
30
30
87
42
87
52
92
52
92
7
87
85
91
91
6
87
3
58
92
91
58
12.
Attach the Top Frame (6) between the Squat Upright
(4) and the Swivel Upright (5) with four M10 x 95mm
Bolts (92), the two Short Frame Plates (52), and two
M10 Nylon Locknuts (87) as shown.
Do not tighten
the Bolts and Locknuts yet.
Attach the four Weight Guides (42) to the Top Frame
(6) with two M10 x 165mm Bolts (30) and two M10
Nylon Locknuts (87).
Small
Tab