Weider Pro 8000 Uk Manual - Page 19
Locate the Right Stack Cable 68.
View all Weider Pro 8000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
47. Route the Leg Lever Cable (70) over a 90mm 47 Pulley (39) and down through the Right Top Frame (7). Attach the Pulley inside the Top Frame with an M10 x 80mm Bolt (111), two M10 Washers (116), two 19mm Spacers (77), and an M10 Nylon Locknut (114). 48. Set an M12 Washer (129) on top of the Short 48 Weight Tube (123). Thread an M12 Nut (128) all the way onto the Leg Lever Cable (70). Thread the Leg Lever Cable (70) into the Short Weight Tube (123). Tighten the M12 Nut (128) against the M12 Washer (129). 111 116 77 39 7 70 116 77 114 70 128 129 123 49. Locate the Right Stack Cable (68). Attach the 49 Cable to the Left Top Frame (8) with an M8 x 80mm Bolt (94), an M8 Washer (117), and an M8 Nylon Locknut (115). Make sure the flat edge of the Cable is against the Upright. 50. Wrap the Right Stack Cable (68) under a 90mm 50 Pulley (39). Attach the Pulley, a Small Cable Trap (48), and two Half Finger Guards (42) to the upper hole in the indicated "U"-bracket (50) with an M10 x 52mm Bolt (102) and an M10 Nylon Locknut (114). Make sure the Cable Trap is ori- ented to hold the Cable in the groove of the Pulley. 51. Wrap the Right Stack Cable (68) over a "V"-pulley 51 (40). Attach the "V"-pulley and a Cable Trap (49) to the Left Top Frame (8) with an M10 x 55mm Bolt (137) and an M10 Nylon Locknut (114). Make sure the Cable Trap is oriented to hold the Cable in the groove of the Pulley. 94 8 68 117 115 Flat Edge 42 39 68 48 42 114 50 102 114 8 68 40 49 137 19