eMachines E644G eMachines E644 and E644G Series Serivce Guide - Page 110
ODD Board Removal, ODD Board Installation
View all eMachines E644G manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 110 highlights
ODD Board Removal 0 Prerequisite: Upper Cover Removal 1. Find ODD board (C) on lower cover. (Figure 3-24) 2. Disconnect ODD board FFC from mainboard connector (A). (Figure 3-26) B A Figure 3-26. ODD Board 3. Remove screw (B) from lower cover. (Figure 3-26) 4. Remove ODD board from lower cover. ODD Board Installation 0 1. Install USB module (C) on lower cover. (Figure 3-24) 2. Install and secure screw (B) to lower cover. (Figure 3-26) 3. Connect ODD board FFC to mainboard connector (A). (Figure 3-26) 4. Install upper cover. ID Size B M2.5*5.0 Quantity 1 Screw Type 3-30 Machine Maintenance Procedures
3-30
Machine Maintenance Procedures
ODD Board Removal
0
Prerequisite:
Upper Cover Removal
1.
Find ODD board (C) on lower cover. (
Figure 3-24
)
2.
Disconnect ODD board FFC from mainboard connector (A). (Figure 3-26)
Figure 3-26.
ODD Board
3.
Remove screw (B) from lower cover. (Figure 3-26)
4.
Remove ODD board from lower cover.
ODD Board Installation
0
1.
Install USB module (C) on lower cover.
(Figure 3-24)
2.
Install and secure screw (B) to lower cover. (Figure 3-26)
3.
Connect ODD board FFC to mainboard connector (A). (Figure 3-26)
4.
Install upper cover.
ID
Size
Quantity
Screw Type
B
M2.5*5.0
1
B
A