eMachines E644G eMachines E644 and E644G Series Serivce Guide - Page 94
Base Door Removal, Base Door Installation
View all eMachines E644G manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 94 highlights
Base Door Removal 0 Prerequisite: Battery Pack Removal 1. Locate base door (B) on lower cover. (Figure 3-9) 2. Remove two (2) screws (A). (Figure 3-9) 3. Remove door from lower cover. BC A Figure 3-9. Base Door Base Door Installation 0 1. Insert door flanges into slots (B) on lower cover. (Figure 3-9) 2. Secure door to lower cover with two (2) screws (A). (Figure 3-9) 3. Install battery pack. 3-14 Machine Maintenance Procedures
3-14
Machine Maintenance Procedures
Base Door Removal
0
Prerequisite:
Battery Pack Removal
1.
Locate base door (B) on lower cover. (Figure 3-9)
2.
Remove two (2) screws (A). (Figure 3-9)
3.
Remove door from lower cover.
Figure 3-9.
Base Door
Base Door Installation
0
1.
Insert door flanges into slots (B) on lower cover. (Figure 3-9)
2.
Secure door to lower cover with two (2) screws (A). (Figure 3-9)
3.
Install battery pack.
C
B
A