eMachines E644G eMachines E644 and E644G Series Serivce Guide - Page 87
Getting Started
View all eMachines E644G manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 87 highlights
Getting Started 0 Flowchart Figure 3-1 identifies sections for the removal and install sequence. Follow the order of the sequence to avoid damage to any of the hardware components. Do the following prior to starting any maintenance procedures: 1. Remove power (A) from the system and peripherals. 2. Remove all cables from system. A Figure 3-2. AC Adapter Outlet 3. Put system on a stable work surface. Machine Maintenance Procedures 3-7
Machine Maintenance Procedures
3-7
Getting Started
0
Flowchart
Figure 3-1
identifies sections for the removal and install sequence. Follow the order
of the sequence to avoid damage to any of the hardware components.
Do the following prior to starting any maintenance procedures:
1.
Remove power (A) from the system and peripherals.
2.
Remove all cables from system.
Figure 3-2.
AC Adapter Outlet
3.
Put system on a stable work surface.
A