Cisco 6509E Supervisor Guide - Page 74
Clearing the EMI Gasket in a Horizontal Slot Chassis
View all Cisco 6509E manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 74 highlights
Installing a Supervisor Engine Chapter 3 Installing Supervisor Engines c. Using the thumb and forefinger of each hand, grasp the two ejector levers and gently press down to create a small 0.040 inch (1 mm) gap between the supervisor engine's EMI gasket and the module or cover plate above it. (See Figure 3-2.) Note Do not press down too forcefully on the levers because they will bend and get damaged. Figure 3-2 Clearing the EMI Gasket in a Horizontal Slot Chassis 1 2 3 Press down 4 12 FAN STATUS 5 6 Press down 3 4 4 5 1mm Gap between the module EMI gasket and the module above it 66 130909 d. While gently pressing down, simultaneously close the left and right ejector levers to fully seat the supervisor engine in the backplane connector. The ejector levers are fully closed when they are flush with the supervisor engine faceplate. Note Failure to fully seat the supervisor engine in the backplane connector can result in error messages. e. Tighten the two captive installation screws on the supervisor engine. Note Make sure the ejector levers are fully closed before tightening the captive installation screws. f. Verify that the supervisor engine STATUS LED is lit. Catalyst 6500 Series Supervisor Engine Guide 3-6 OL-7397-03