Dell PowerStore 1200T EMC PowerStore Networking Guide for PowerStore T Models - Page 16

Switch and network requirements for initial deployment, Management switch connectivity

Page 16 highlights

4 Switch and network requirements for initial deployment This chapter includes the following information. Topics: • Management switch connectivity • Types of networks required for initial deployment • VLAN options during initial deployment • IP requirements for initial deployment Management switch connectivity Deployment with at least one out-of-band management switch is required for all PowerStore T model deployments. Node to Management switch connectivity requirements The Management switch must be connected through the 1 GbE management port on each of the appliance base enclosure nodes as demonstrated in the following diagrams. PowerStore T Management Switch Network Topology Management Switch Node A Mgmt Node B Mgmt PowerStore T Appliance Legend: 1 Gb Figure 1. Management switch network topology 16 Switch and network requirements for initial deployment

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118

Switch and network requirements for initial
deployment
This chapter includes the following information.
Topics:
Management switch connectivity
Types of networks required for initial deployment
VLAN options during initial deployment
IP requirements for initial deployment
Management switch connectivity
Deployment with at least one out-of-band management switch is required for all PowerStore T model deployments.
Node to Management switch connectivity requirements
The Management switch must be connected through the 1 GbE management port on each of the appliance base enclosure
nodes as demonstrated in the following diagrams.
Management
Switch
Node B
Node A
Legend:
1 Gb
PowerStore T Appliance
Mgmt
Mgmt
PowerStore T Management Switch
Network Topology
Figure 1. Management switch network topology
4
16
Switch and network requirements for initial deployment