Con the Replication and Block Import network on the ToR switches

Page 69 highlights

Table 28. Code sample for configuring ToR switches for NVMe/TCP networks Switch 1 Switch 2 configure terminal interface vlan 300 description NVMe_Network no shutdown exit interface ethernet 1/1/5 description NodeA_IO_0_port_0 no shutdown switchport mode trunk switchport trunk allowed vlan 300 mtu 9216 exit interface port-channel 50 switchport trunk allowed vlan 300 exit configure terminal interface vlan 300 description NVMe_Network no shutdown exit interface ethernet 1/1/50 description NodeB_IO_0_port_0 no shutdown switchport mode trunk switchport trunk allowed vlan 300 mtu 9216 exit interface port-channel 50 switchport trunk allowed vlan 300 exit Configure the Replication and Block Import network on the ToR switches The following steps use the resources from the example used in this document. If you did not use the same resources, see your completed Network Preparation Worksheet for Storage services. 1. Establish a terminal connection to the first ToR switch (Switch1). 2. Enter global configuration mode. configure terminal 3. Create the Replication and Block Import VLAN. interface vlan 400 description RepBlockImport_Network no shutdown exit 4. Configure Replication and Block Import VLAN for Node A ports interface ethernet 1/1/2 switchport trunk allowed vlan 400 exit 5. Configure the Replication and Block Import VLAN on the uplinks interface port-channel 50 switchport trunk allowed vlan 400 exit 6. Repeat steps 1 - 5 on the second ToR switch (Switch2) as demonstrated below. NOTE: Be sure to use the correct ethernet ports when configuring the second ToR switch (Switch2) Configuring PowerStore T model with Dell PowerSwitch Series S4148 Top-of-Rack switches 69

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118

Table 28. Code sample for configuring ToR switches for NVMe/TCP networks
Switch 1
Switch 2
configure terminal
interface vlan 300
description NVMe_Network
no shutdown
exit
interface ethernet 1/1/5
description NodeA_IO_0_port_0
no shutdown
switchport mode trunk
switchport trunk allowed vlan 300
mtu 9216
exit
interface port-channel 50
switchport trunk allowed vlan 300
exit
configure terminal
interface vlan 300
description NVMe_Network
no shutdown
exit
interface ethernet 1/1/50
description NodeB_IO_0_port_0
no shutdown
switchport mode trunk
switchport trunk allowed vlan 300
mtu 9216
exit
interface port-channel 50
switchport trunk allowed vlan 300
exit
Configure the Replication and Block Import network on the ToR
switches
The following steps use the resources from the example used in this document. If you did not use the same resources, see your
completed
Network Preparation Worksheet for Storage services
.
1.
Establish a terminal connection
to the first ToR switch (Switch1).
2.
Enter global configuration mode.
configure terminal
3.
Create the Replication and Block Import VLAN.
interface vlan 400
description RepBlockImport_Network
no shutdown
exit
4.
Configure Replication and Block Import VLAN for Node A ports
interface ethernet 1/1/2
switchport trunk allowed vlan 400
exit
5.
Configure the Replication and Block Import VLAN on the uplinks
interface port-channel 50
switchport trunk allowed vlan 400
exit
6.
Repeat steps 1 - 5 on the second ToR switch (Switch2) as demonstrated below.
NOTE:
Be sure to use the correct ethernet ports when configuring the second ToR switch (Switch2)
Configuring PowerStore T model with Dell PowerSwitch Series S4148 Top-of-Rack switches
69